NEET 1/24/2024 08:24:00 No. 807089 [Open] [Reply] Actions report Translate Thread... Hide Thread Translate... Hide Post >>/807088/ What? Two rows of bricks were laid in line with the existing bricks, and then plaster applied on the internal brickwork over successive days until it was level with the existing render.